France, GrenobleIn fact, all this material was in frequent use, not during the Olympic period, as no important snow fall took place, but during the preceding month. Very heavy continuous snow falls (altogether several metres thick) took place from the end of December, and the material and personnel only just available, were sorely tried while still training.
If these roads were always kept completely cleared, it was not the same for the third class roads and car parks, which were cleared with difficulty by means of rotary machines. They were made available only a few days before the Opening of the Games.